5.5 KWP Solar Water Pumping System
Construction of Solar Water Pumping System for wildlife and livestock to reduce human and wildlife conflict. The project was funded by African Wildlife Foundation (AWF).
Timeline
24 months
Status
Handed Over
Project Execution
The project was delivered through an integrated and coordinated execution approach.
The Project Process Involved:
Survey Works
From the borehole area towards the tank, and the distribution lines.
Installation
Installation of the solar pumping system and lowering of submersible pump.
Excavation Works
For foundation for masonry tank, troughs and pipeline trenches.
Concrete Works & Laying of Pipes
Concrete works for floor and roof slabs, walling and steel bending for masonry tank. Laying of pipes and checking of levels including all necessary plumbing works.
Project Specifications
Project Type
Building & Water Infrastructure
Construction Method
Reinforced Concrete Works
Storage Capacity
Elevated Masonry Tank
Energy Source
Solar Photovoltaic System
Compliance Standards
Local Authority & NCA
Project Start Date
January 2024
Project Completion
December 2025
Project Progress
100%